Canton Jura overview
Ranking · Data 2025 · Source: BFS

The greatest solar potential in canton Jura

National ranking

Delémont has the greatest solar-energy potential in canton Jura: its roofs could generate about 107 GWh of electricity a year. Next come Haute-Sorne (80 GWh) and Porrentruy (63 GWh). This is modelled roof potential — largest where there is the most roof area, not current generation. Source: BFE.

Ranking

BFE · 2025
RankMunicipalityRoof potentialResidents
1Delémont107 GWh12'739
2Haute-Sorne80 GWh7'362
3Porrentruy63 GWh6'601
4Val Terbi41 GWh3'269
5Courgenay39 GWh2'453
6Saignelégier35 GWh2'568
7Courrendlin33 GWh3'667
8Courroux33 GWh3'396
9Haute-Ajoie32 GWh1'057
10Alle30 GWh1'907
11Boncourt28 GWh1'171
12La Baroche26 GWh1'134
13Clos du Doubs26 GWh1'294
14Courtételle25 GWh2'724
15Le Noirmont24 GWh1'957
16Basse-Allaine23 GWh1'203
17Les Breuleux23 GWh1'642
18Fontenais21 GWh1'647
19Develier20 GWh1'372
20Basse-Vendline20 GWh767
21Bure18 GWh631
22Les Bois18 GWh1'252
23Cornol14 GWh1'060
24Montfaucon14 GWh566
25Muriaux13 GWh508
26Lajoux13 GWh710
27Boécourt13 GWh961
28Coeuve12 GWh721
29Fahy11 GWh332
30Vendlincourt11 GWh547
31Les Genevez11 GWh510
32Courtedoux10 GWh774
33Grandfontaine10 GWh381
34Pleigne10 GWh349
35Damphreux-Lugnez10 GWh363
36Le Bémont9 GWh305
37Bourrignon9 GWh261
38Movelier8 GWh420
39Rossemaison7 GWh733
40Mervelier7 GWh535
41Saint-Brais6 GWh239
42Courchapoix6 GWh445
43Saulcy5 GWh273
44Courchavon5 GWh314
45Châtillon5 GWh494
46Soyhières4 GWh431
47Ederswiler4 GWh117
48Les Enfers4 GWh149
49Soubey4 GWh125
50Mettembert2 GWh112
Bundesamt für Energie (BFE), retrieved 10.08.2026

How we measure this

BFE

Modelled annual electricity that rooftop photovoltaics could produce across the whole municipality, in gigawatt-hours per year, from the BFE «Solarenergiepotenziale der Schweizer Gemeinden» model (2025 snapshot). It is a potential, not installed capacity or actual generation, and it scales with roof area — so large towns lead simply because they have more roofs. It is a rolling model snapshot, not an annual survey. The companion roofs-plus-façades scenario adds vertical surfaces.

Frequently asked questions

Which municipality in canton Jura has the greatest solar potential?
Delémont, whose roofs could generate about 107 GWh of electricity a year (2025) — the greatest modelled roof potential of any municipality in canton Jura.
Does this mean the municipality actually produces this much solar power?
No. It is the modelled potential of the available roof surfaces — the electricity they could generate if fully used. Actual installed photovoltaics produce far less. The figure comes from the BFE solar model and scales with how much roof area a municipality has.