Skip to main content
Ranking · Data 2025 · Source: BFS

The greatest solar potential in canton Jura

National ranking →

Delémont has the greatest solar-energy potential in canton Jura: its roofs could generate about 107 GWh of electricity a year. Next come Haute-Sorne (80 GWh) and Porrentruy (63 GWh). This is modelled roof potential — largest where there is the most roof area, not current generation. Source: BFE.

Ranking

BFE · 2025
RankMunicipalityRoof potentialResidents
1Delémont107 GWh12'991
2Haute-Sorne80 GWh7'532
3Porrentruy63 GWh6'597
4Val Terbi41 GWh3'240
5Courgenay39 GWh2'463
6Saignelégier35 GWh2'528
7Courrendlin33 GWh3'737
8Courroux33 GWh3'439
9Haute-Ajoie32 GWh1'063
10Alle30 GWh1'965
11Boncourt28 GWh1'159
12La Baroche26 GWh1'124
13Clos du Doubs26 GWh1'289
14Courtételle25 GWh2'784
15Le Noirmont24 GWh1'936
16Basse-Allaine23 GWh1'182
17Les Breuleux23 GWh1'631
18Fontenais21 GWh1'645
19Develier20 GWh1'397
20Basse-Vendline20 GWh741
21Bure18 GWh660
22Les Bois18 GWh1'246
23Cornol14 GWh1'082
24Montfaucon14 GWh565
25Muriaux13 GWh513
26Lajoux13 GWh712
27Boécourt13 GWh953
28Coeuve12 GWh720
29Fahy11 GWh328
30Vendlincourt11 GWh554
31Les Genevez11 GWh518
32Courtedoux10 GWh749
33Grandfontaine10 GWh362
34Pleigne10 GWh368
35Damphreux-Lugnez10 GWh376
36Le Bémont9 GWh299
37Bourrignon9 GWh259
38Movelier8 GWh422
39Rossemaison7 GWh767
40Mervelier7 GWh523
41Saint-Brais6 GWh248
42Courchapoix6 GWh456
43Saulcy5 GWh274
44Courchavon5 GWh332
45Châtillon5 GWh500
46Soyhières4 GWh461
47Ederswiler4 GWh111
48Les Enfers4 GWh145
49Soubey4 GWh123
50Mettembert2 GWh109
Swiss Federal Office of Energy (SFOE), retrieved 24.09.2026

How we measure this

BFE

Modelled annual electricity that rooftop photovoltaics could produce across the whole municipality, in gigawatt-hours per year, from the BFE «Solarenergiepotenziale der Schweizer Gemeinden» model (2025 snapshot). It is a potential, not installed capacity or actual generation, and it scales with roof area — so large towns lead simply because they have more roofs. It is a rolling model snapshot, not an annual survey. The companion roofs-plus-façades scenario adds vertical surfaces.

Frequently asked questions

Which municipality in canton Jura has the greatest solar potential?
Delémont, whose roofs could generate about 107 GWh of electricity a year (2025) — the greatest modelled roof potential of any municipality in canton Jura.
Does this mean the municipality actually produces this much solar power?
No. It is the modelled potential of the available roof surfaces — the electricity they could generate if fully used. Actual installed photovoltaics produce far less. The figure comes from the BFE solar model and scales with how much roof area a municipality has.