The greatest solar potential in canton Geneva
National ranking →Geneva has the greatest solar-energy potential in canton Geneva: its roofs could generate about 420 GWh of electricity a year. Next come Meyrin (149 GWh) and Vernier (146 GWh). This is modelled roof potential — largest where there is the most roof area, not current generation. Source: BFE.
Ranking
BFE · 2025| Rank | Municipality | Roof potential | Residents |
|---|---|---|---|
| 1 | Geneva | 420 GWh | 206'635 |
| 2 | Meyrin | 149 GWh | 26'882 |
| 3 | Vernier | 146 GWh | 37'460 |
| 4 | Lancy | 106 GWh | 36'229 |
| 5 | Satigny | 100 GWh | 4'577 |
| 6 | Plan-les-Ouates | 93 GWh | 12'221 |
| 7 | Bernex | 85 GWh | 10'864 |
| 8 | Carouge | 79 GWh | 22'311 |
| 9 | Le Grand-Saconnex | 73 GWh | 12'806 |
| 10 | Veyrier | 66 GWh | 11'917 |
| 11 | Thônex | 62 GWh | 16'690 |
| 12 | Collonge-Bellerive | 61 GWh | 8'630 |
| 13 | Chêne-Bougeries | 48 GWh | 13'876 |
| 14 | Versoix | 45 GWh | 13'846 |
| 15 | Onex | 38 GWh | 18'886 |
| 16 | Cologny | 37 GWh | 6'024 |
| 17 | Troinex | 35 GWh | 2'858 |
| 18 | Perly-Certoux | 31 GWh | 3'194 |
| 19 | Pregny-Chambésy | 28 GWh | 4'035 |
| 20 | Chêne-Bourg | 27 GWh | 9'450 |
| 21 | Confignon | 24 GWh | 4'552 |
| 22 | Vandœuvres | 24 GWh | 2'958 |
| 23 | Jussy | 20 GWh | 1'173 |
| 24 | Bellevue | 20 GWh | 4'104 |
| 25 | Bardonnex | 19 GWh | 2'548 |
| 26 | Anières | 18 GWh | 2'521 |
| 27 | Genthod | 18 GWh | 2'896 |
| 28 | Meinier | 18 GWh | 2'079 |
| 29 | Corsier | 16 GWh | 2'282 |
| 30 | Puplinge | 15 GWh | 2'558 |
| 31 | Dardagny | 15 GWh | 1'853 |
| 32 | Collex-Bossy | 12 GWh | 1'685 |
| 33 | Avusy | 11 GWh | 1'408 |
| 34 | Aire-la-Ville | 11 GWh | 1'160 |
| 35 | Avully | 11 GWh | 1'757 |
| 36 | Choulex | 11 GWh | 1'247 |
| 37 | Cartigny | 9 GWh | 1'046 |
| 38 | Chancy | 9 GWh | 1'651 |
| 39 | Russin | 7 GWh | 524 |
| 40 | Céligny | 7 GWh | 874 |
| 41 | Hermance | 6 GWh | 1'236 |
| 42 | Presinge | 6 GWh | 726 |
| 43 | Soral | 6 GWh | 961 |
| 44 | Laconnex | 6 GWh | 670 |
| 45 | Gy | 5 GWh | 550 |
How we measure this
BFEModelled annual electricity that rooftop photovoltaics could produce across the whole municipality, in gigawatt-hours per year, from the BFE «Solarenergiepotenziale der Schweizer Gemeinden» model (2025 snapshot). It is a potential, not installed capacity or actual generation, and it scales with roof area — so large towns lead simply because they have more roofs. It is a rolling model snapshot, not an annual survey. The companion roofs-plus-façades scenario adds vertical surfaces.
Frequently asked questions
- Which municipality in canton Geneva has the greatest solar potential?
- Geneva, whose roofs could generate about 420 GWh of electricity a year (2025) — the greatest modelled roof potential of any municipality in canton Geneva.
- Does this mean the municipality actually produces this much solar power?